Cross post - nuke plant down?

greenspun.com : LUSENET : TimeBomb 2000 (Y2000) : One Thread

Duane Arnold unit 1 located near Palo IA., went down yesterday mourning. Orignally on their local news listed as a Y2K problem. Our local news in central IA. said it was due to a redundant safety system. Seems to be a sensor went off that had to due with overheating of the rods and locked the plant down. people told not to worry yet plat shut down for at least a week, will not allow flight over plant. Very little in the news on this, wasn't even a top news item here. Sound suspicious ? Overheating rods? Not a problem? will try to gather more info.

-- Ed (ed@lizzardranch.com), January 08, 2000

Answers

--it's allright, happens all the time, in fact, according to board insiders and researchers, nuke plants are always down because of refuelling, scheduled maintenance, testing, sunspots and dandruff. Because of this, all reports of "down" should be regarded as "normal" in fact "down" is "up" so they can keep having their checks direct deposited into their fully functioning accounts with no glitches.

BTW, thanks for the report, all these little anecedotal things are all we have to go on, because...........ITAIN'TWHYTOOKAY

-- itaintwhytookay (same@asalways.rumormill.arghhh), January 08, 2000.


What's event#36565?

===================================

http://www.nrc.gov/NRR/DAILY/psr.htm

NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 01/07/2000 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

REG PLANT NAME %PWR DOWN REASON OR COMMENT * # --- ------------------------ ---- -------- --------------------------- ----- - - 1 BEAVER VALLEY 1 100 ---------------------------------------------------------------------- ---------- 1 BEAVER VALLEY 2 100 ---------------------------------------------------------------------- ---------- 1 CALVERT CLIFFS 1 100 ---------------------------------------------------------------------- ---------- 1 CALVERT CLIFFS 2 100 ---------------------------------------------------------------------- ---------- 1 FITZPATRICK 1 100 ---------------------------------------------------------------------- ---------- 1 GINNA 1 100 ---------------------------------------------------------------------- ---------- 1 HOPE CREEK 1 100 ---------------------------------------------------------------------- ---------- 1 INDIAN POINT 2 99 ---------------------------------------------------------------------- ---------- 1 INDIAN POINT 3 100 ---------------------------------------------------------------------- ---------- 1 LIMERICK 1 100 ---------------------------------------------------------------------- ---------- 1 LIMERICK 2 100 ---------------------------------------------------------------------- ---------- 1 MILLSTONE 2 100 ---------------------------------------------------------------------- ---------- 1 MILLSTONE 3 100 ---------------------------------------------------------------------- ---------- 1 NINE MILE POINT 1 100 * ---------------------------------------------------------------------- ---------- 1 NINE MILE POINT 2 100 ---------------------------------------------------------------------- ---------- 1 OYSTER CREEK 1 100 ---------------------------------------------------------------------- ---------- 1 PEACH BOTTOM 2 100 ---------------------------------------------------------------------- ---------- 1 PEACH BOTTOM 3 100 ---------------------------------------------------------------------- ---------- 1 PILGRIM 1 100 ---------------------------------------------------------------------- ---------- 1 SALEM 1 0 01/06/00 Hot Standby * 1 MANUAL REACTOR TRIP DUE TO LOSS OF MFP CAUSED BY ISOLATION OF LP FW HEATER STRINGS - SEE EVENT #36567 ---------------------------------------------------------------------- ---------- 1 SALEM 2 100 ---------------------------------------------------------------------- ---------- 1 SEABROOK 1 100 ---------------------------------------------------------------------- ---------- 1 SUSQUEHANNA 1 100 ---------------------------------------------------------------------- ---------- 1 SUSQUEHANNA 2 100 ---------------------------------------------------------------------- ---------- 1 THREE MILE ISLAND 1 100 ---------------------------------------------------------------------- ---------- 1 VERMONT YANKEE 1 100 ---------------------------------------------------------------------- ---------- NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 01/07/2000 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

REG PLANT NAME %PWR DOWN REASON OR COMMENT * # --- ------------------------ ---- -------- --------------------------- ----- - - 2 BROWNS FERRY 1 0 03/03/85 Refueling DEFUELED ---------------------------------------------------------------------- ---------- 2 BROWNS FERRY 2 100 ---------------------------------------------------------------------- ---------- 2 BROWNS FERRY 3 100 ---------------------------------------------------------------------- ---------- 2 BRUNSWICK 1 100 ---------------------------------------------------------------------- ---------- 2 BRUNSWICK 2 100 ---------------------------------------------------------------------- ---------- 2 CATAWBA 1 100 ---------------------------------------------------------------------- ---------- 2 CATAWBA 2 15 Power Operation * HOLDING POWER - MAINTENANCE ON FEEDWATER ISOLATION VALVES IN PROGRESS ---------------------------------------------------------------------- ---------- 2 CRYSTAL RIVER 3 100 ---------------------------------------------------------------------- ---------- 2 FARLEY 1 100 ---------------------------------------------------------------------- ---------- 2 FARLEY 2 100 ---------------------------------------------------------------------- ---------- 2 HARRIS 1 100 ---------------------------------------------------------------------- ---------- 2 HATCH 1 100 ---------------------------------------------------------------------- ---------- 2 HATCH 2 98 Power Operation MAXIMUM OPERATING POWER ---------------------------------------------------------------------- ---------- 2 MCGUIRE 1 100 ---------------------------------------------------------------------- ---------- 2 MCGUIRE 2 100 ---------------------------------------------------------------------- ---------- 2 NORTH ANNA 1 100 ---------------------------------------------------------------------- ---------- 2 NORTH ANNA 2 100 * ---------------------------------------------------------------------- ---------- 2 OCONEE 1 100 ---------------------------------------------------------------------- ---------- 2 OCONEE 2 100 ---------------------------------------------------------------------- ---------- 2 OCONEE 3 100 ---------------------------------------------------------------------- ---------- 2 ROBINSON 2 100 ---------------------------------------------------------------------- ---------- 2 SEQUOYAH 1 100 ---------------------------------------------------------------------- ---------- 2 SEQUOYAH 2 100 ---------------------------------------------------------------------- ---------- 2 ST LUCIE 1 100 ---------------------------------------------------------------------- ---------- 2 ST LUCIE 2 100 ---------------------------------------------------------------------- ---------- 2 SUMMER 1 100 ---------------------------------------------------------------------- ---------- 2 SURRY 1 100 ---------------------------------------------------------------------- ---------- 2 SURRY 2 100 ---------------------------------------------------------------------- ---------- 2 TURKEY POINT 3 100 ---------------------------------------------------------------------- ---------- 2 TURKEY POINT 4 100 ---------------------------------------------------------------------- ---------- 2 VOGTLE 1 100 ---------------------------------------------------------------------- ---------- 2 VOGTLE 2 100 ---------------------------------------------------------------------- ---------- 2 WATTS BAR 1 100 ---------------------------------------------------------------------- ---------- NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 01/07/2000 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

REG PLANT NAME %PWR DOWN REASON OR COMMENT * # --- ------------------------ ---- -------- --------------------------- ----- - - 3 BRAIDWOOD 1 100 ---------------------------------------------------------------------- ---------- 3 BRAIDWOOD 2 100 ---------------------------------------------------------------------- ---------- 3 BYRON 1 100 ---------------------------------------------------------------------- ---------- 3 BYRON 2 100 ---------------------------------------------------------------------- ---------- 3 CLINTON 1 100 ---------------------------------------------------------------------- ---------- 3 COOK 1 0 09/08/97 Refueling REFUELING OUTAGE - DEFUELED ---------------------------------------------------------------------- ---------- 3 COOK 2 0 09/09/97 Refueling REFUELING OUTAGE - DEFUELED ---------------------------------------------------------------------- ---------- 3 DAVIS BESSE 1 100 ---------------------------------------------------------------------- ---------- 3 DRESDEN 2 100 ---------------------------------------------------------------------- ---------- 3 DRESDEN 3 100 ---------------------------------------------------------------------- ---------- 3 DUANE ARNOLD 1 0 01/05/00 Cold Shutdown * REACTOR SCRAM ON SPURIOUS LOW RVWL DURING I&C MAINTENANCE - SEE EVENT #36565 ---------------------------------------------------------------------- ---------- 3 FERMI 2 93 Power Operation * INCREASING POWER TO 97% ---------------------------------------------------------------------- ---------- 3 KEWAUNEE 1 97 ---------------------------------------------------------------------- ---------- 3 LASALLE 1 100 ---------------------------------------------------------------------- ---------- 3 LASALLE 2 100 ---------------------------------------------------------------------- ---------- 3 MONTICELLO 1 0 01/05/00 Cold Shutdown * REFUELING OUTAGE ---------------------------------------------------------------------- ---------- 3 PALISADES 1 75 Power Operation CHEMISTRY HOLD ---------------------------------------------------------------------- ---------- 3 PERRY 1 100 ---------------------------------------------------------------------- ---------- 3 POINT BEACH 1 100 ---------------------------------------------------------------------- ---------- 3 POINT BEACH 2 100 ---------------------------------------------------------------------- ---------- 3 PRAIRIE ISLAND 1 100 ---------------------------------------------------------------------- ---------- 3 PRAIRIE ISLAND 2 100 ---------------------------------------------------------------------- ---------- 3 QUAD CITIES 1 100 ---------------------------------------------------------------------- ---------- 3 QUAD CITIES 2 90 Power Operation COASTDOWN TO REFUELING OUTAGE ---------------------------------------------------------------------- ---------- NRC OPERATIONS CENTER PLANT STATUS REPORT FOR 01/07/2000 UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

REG PLANT NAME %PWR DOWN REASON OR COMMENT * # --- ------------------------ ---- -------- --------------------------- ----- - - 4 ARKANSAS NUCLEAR 1 100 ---------------------------------------------------------------------- ---------- 4 ARKANSAS NUCLEAR 2 100 ---------------------------------------------------------------------- ---------- 4 CALLAWAY 1 100 ---------------------------------------------------------------------- ---------- 4 COMANCHE PEAK 1 100 ---------------------------------------------------------------------- ---------- 4 COMANCHE PEAK 2 100 ---------------------------------------------------------------------- ---------- 4 COOPER 1 100 ---------------------------------------------------------------------- ---------- 4 DIABLO CANYON 1 100 ---------------------------------------------------------------------- ---------- 4 DIABLO CANYON 2 100 ---------------------------------------------------------------------- ---------- 4 FT CALHOUN 1 100 ---------------------------------------------------------------------- ---------- 4 GRAND GULF 1 100 ---------------------------------------------------------------------- ---------- 4 PALO VERDE 1 99 Power Operation * REDUCED POWER FOR SG BLOWDOWNS ---------------------------------------------------------------------- ---------- 4 PALO VERDE 2 0 01/05/00 Hot Standby MAINTENANCE OUTAGE ---------------------------------------------------------------------- ---------- 4 PALO VERDE 3 100 ---------------------------------------------------------------------- ---------- 4 RIVER BEND 1 100 ---------------------------------------------------------------------- ---------- 4 SAN ONOFRE 2 100 ---------------------------------------------------------------------- ---------- 4 SAN ONOFRE 3 100 ---------------------------------------------------------------------- ---------- 4 SOUTH TEXAS 1 100 ---------------------------------------------------------------------- ---------- 4 SOUTH TEXAS 2 100 * ---------------------------------------------------------------------- ---------- 4 WATERFORD 3 100 ---------------------------------------------------------------------- ---------- 4 WNP2 100 ---------------------------------------------------------------------- ---------- 4 WOLF CREEK 1 100 ---------------------------------------------------------------------- ---------- * - REASON OR COMMENT HAS BEEN CHANGED IN PAST 24 HOURS # - NUMBER OF REACTOR SCRAMS WITHIN PAST 24 HOURS NOTE - REACTOR STATUS DATA COLLECTED BETWEEN 4 A.M. AND 8 A.M. EACH DAY. ALL TIMES ARE BASED ON EASTERN TIMES (ET).



-- Hokie (Hokie_@hotmail.com), January 08, 2000.


Was this all yesterday. Is this normal orwhat . Looks like it's gettin deep to me ,could you please go into more detail.

-- (freeman@interx.net), January 08, 2000.

Situation normal all f***ed up.

-- Mara (MaraWayne@aol.com), January 08, 2000.

Uhhhh MARA...is this supposed to comfort me? Geez Louise.

beej

-- beej (beej@ppbbs.com), January 08, 2000.



Try the event report page

http://www.nrc.gov/OPA/

-- cin (cinlooo@aol.com), January 08, 2000.


"Reactor SCRAM on spurious low LVWL during I&C maintenance". Now forgive my ignorance of nuclear power plant terminology, but would "I&C" happen to be "Instrumentation and Controls"? You know, those monitoring instrument and control systems that EMBEDDED DEVICES are used in?

How many times does it have to be said? And if it isn't Y2K it's one helluva interesting coincidence.

WW

-- Wildweasel (vtmldm@epix.net), January 08, 2000.